Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake)
DOI:
https://doi.org/10.54367/jrkms.v1i2.282Abstract
The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.References
Dake, JMK. (1989). Hidrolika Teknik. Jakarta: Penerbit Erlangga.
Sasongko, Dj. (1989). Teknik Sumber Daya Air I.Jakarta: Penerbit Erlangga.
Sosrodarsono, S. (1989). Hidrologi Untuk Pengairan, Bandung
Suripin. (2008). Buku Ajar Hidrolika. Semarang: Departemen Teknik Sipil Universitas Diponegoro
Downloads
Published
How to Cite
Issue
Section
License
JRKMS merupakan jurnal ilmiah yang menerapkan sistem akses terbuka penuh (fully open access), sehingga seluruh artikel yang diterbitkan dapat diakses secara bebas oleh semua pengguna melalui internet segera setelah dipublikasikan.
Penggunaan dan pendistribusian artikel dalam media apa pun untuk tujuan nonkomersial diperbolehkan, dengan ketentuan bahwa penulis dan jurnal dicantumkan sebagai sumber secara tepat. Hak cipta atas karya ilmiah tetap berada pada penulis.








