Analisis Faktor-Faktor Eksternal Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Pekerjaan Pembuatan Batako

Authors

  • Sebastianus Baki HENONG Universitas Katolik Widya Mandira Kupang
  • Reginaldo Ch. LAKE Universitas Katolik Widya Mandira Kupang

DOI:

https://doi.org/10.54367/jrkms.v2i2.526

Abstract

productivity is the ratio between output and input, or the comparison between product results and the total resources used. Based on several field observations, the productivity of labor spread across the city of Kupang, especially in brick production, varies greatly. As a result of varying productivity, the results obtained are also very varied. This research was completed with a multiple regression analysis method that began with the collection of raw data through site surveys the distribution of questionnaires to respondents including the owners of brick companies and brick workers in the city of Kupang. Of the five external factors that are used to determine how they affect the productivity of brickworkers in Kupang City, the influence factor is the weather. The significant value of the effect of X3 on Y was 0.279 > 0.05 and the t value was 2.095 > t table 2.00758. Thus it can be concluded that H3 is accepted which means there is an influence of X3 on Y. While the other four factors namely the distance of raw materials to the production machine, cleanliness, wages and motivation do not affect the productivity of the brickworkers..

References

Darmono. (2006). Teknologi pembuatan bahan bangunan berbahan pasir (Batako) hasil erupsi Merapi di Lereng Bagian Utara. Jurnal Inotek, 16(1)

Ervianto, W. I. (2005). Teori-Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset

Harun, M. (2013). Analisa Produktivitas Tenega Kerja Pada Pekerjaan Konstruksi Gedung. Jurnal Ilmiah Mitsu, 1(2)

Hasibuan, M. (1996). Organisasi dan Motivasi Dasar Peningkatan Produktivitas. Jakarta: Bumi Aksara

Simanjuntak, M.R.A. dkk. (2012). Analisis Faktor-Faktor dan Variabel Produktivitas Pekerjaan FasadeKaca Pada Bangunan Gedung Tinggi Perkantoran Di Kawasan Kuningan Jakarta Selatan. Jurnal Ilmiah Media Engineering, 2(1)

Soeharto, I. (2001). Manajemen Proyek: Dari Konseptual sampai Operasional. Jakarta

ErlanggaSutikno. (2000). Faktor – faktor Yang Berpengaruh Terhadap Produktivitas Pemasangan Dinding Batu Bata Di Proyek Perumahan Vila Bukit Mas

UU Pokok Ketenagakerjaan No. 14 Tahun 1969 tentang Ketentuan-Ketentuan Pokok Mengenai Tenaga Kerja

UU No. 13 Tahun 2003 tentang Ketenagakerjaan

Wuryanti, W. (2010). Standarisasi Pedoman Pengukuran Produktivitas Tenaga Kerja untuk Pekerjaan Konstruksi Bangun Gedung. Prosiding PPI Standardisasi Banjarmasin

Published

2019-09-06

How to Cite

HENONG, S. B., & LAKE, R. C. (2019). Analisis Faktor-Faktor Eksternal Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Pekerjaan Pembuatan Batako. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 2(2), 133–140. https://doi.org/10.54367/jrkms.v2i2.526

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.