[1]
Friastri, S. and Setiawan, A. 2024. Systematic Literature Review: Peranan metode BIM dalam Integrated Project Delivery (IPD) untuk Mencapai Triple Constraint. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). 7, 1 (Jul. 2024), 39–46. DOI:https://doi.org/10.54367/jrkms.v7i1.3182.