[1]
Castollani, A. and Puro, S. 2020. Analisis Biaya dan Waktu pada Proyek Apartemen Dengan Metode Earned Value Concept. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). 3, 1 (Apr. 2020), 39–48. DOI:https://doi.org/10.54367/jrkms.v3i1.701.