[1]
Ratih, S.Y. and Irnawan, D. 2020. Analisis Proyeksi Jadwal Dan Biaya Akhir Dengan Konsep Nilai Hasil Pada Proyek Konstruksi. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS). 3, 2 (Sep. 2020), 97–106. DOI:https://doi.org/10.54367/jrkms.v3i2.856.