Manus, J. S. M., Marsaoly, N., & Hakim, R. (2022). Analisis Faktor Keterlambatan Pekerjaan Preservasi Jalan Weda-Sagea Berdasarkan Persepsi Stakeholder. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 5(1), 51–59. https://doi.org/10.54367/jrkms.v5i1.1709