FRIASTRI, S.; SETIAWAN, A. Systematic Literature Review: Peranan metode BIM dalam Integrated Project Delivery (IPD) untuk Mencapai Triple Constraint. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), [S. l.], v. 7, n. 1, p. 39–46, 2024. DOI: 10.54367/jrkms.v7i1.3182. Disponível em: https://ejournal.ust.ac.id/index.php/JRKMS/article/view/3182. Acesso em: 22 dec. 2024.