Manus, J. S. M., Marsaoly, N. and Hakim, R. (2022) “Analisis Faktor Keterlambatan Pekerjaan Preservasi Jalan Weda-Sagea Berdasarkan Persepsi Stakeholder”, Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 5(1), pp. 51–59. doi: 10.54367/jrkms.v5i1.1709.