Friastri, S., and A. Setiawan. “Systematic Literature Review: Peranan Metode BIM Dalam Integrated Project Delivery (IPD) Untuk Mencapai Triple Constraint”. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), vol. 7, no. 1, July 2024, pp. 39-46, doi:10.54367/jrkms.v7i1.3182.